Somerset Wastewater Treatment Plant Improvements

The base bid work consists of providing and installing a sludge drying bed including concrete retaining walls, sand, stone, fabric, sludge distribution lines, drain lines, and all other equipment shown on the plans. The base bid work also includes the removal and disposal of the existing lagoon 2 equipment. Removal, dewatering (20% solids), chemical addition (PAC), and disposal of sludge from existing lagoon. Inspection and repair of clay liner in the lagoon as needed to provide a working system. Providing and installing a new lagoon system including all piping, fittings, valves and equipment startup. The Contractor shall furnish a mobile trash pump for pumping operations. The Contractor is responsible for all permitting and testing requirements for proper disposal of all materials
00 Full Set of Specs (click to expand/collapse)