Public Jobs

Bids due in 20 days
8/30/22 3:30pm
3108 Municipal Building Renovations - Clerk's Office Flooring
Bids due in 20 days
Town of Tonawanda Engineering Department
Town of Tonawanda
Flooring for Town Clerk's Office
Bids due in 20 days
8/30/22 3:30pm
3131 Unit Heater for Police Department
Bids due in 20 days
Town of Tonawanda Engineering Department
Town of Tonawanda
Unit Heater for Town Police Department Garage
Bids due in 20 days
8/30/22 3:30pm
3106.1 Highway Department Rapid Make Up Air Replacement Unit #2
Bids due in 20 days
Town of Tonawanda Engineering Department
Town of Tonawanda
Rapid Make Up Air Replacement Unit for Town Highway Building
Bids due in 21 days
8/31/22 10:30am
Wastewater Treatment Plant Gravity Thickener Replacement
Bids due in 21 days
GHD Group
Town of Grand Island
Wastewater Treatment Plant Thickener Replacement, Town Job. No. M-238. The work under this Project includes the following: Furnishment and Installation of Gravity Thickener Mechanical and Electrical Equipment, including controls and accessories, and all else necessary to furnish a complete project as shown and specified in the Contract Documents.
Bids due in 22 days
9/1/22 11:00am
Buffalo Sewer Authority- Interiors Renovation Project
Bids due in 22 days
Wendel Companies
1038 City Hall Buffalo, NY and Bird Island Waste Water Treatment Plant- 90 foot of West Ferry St., Buffalo NY
The work includes the furnishing of all material, labor, and equipment necessary and proper to complete the construction and renovation of the Sewer Maintenance and Mega Structure buildings at the Bird Island Site and at 1038 City Hall. All work is to include any and all incidental work and materials necessary to fully complete the project as described by the Contract Drawings and Specifications or as directed by the Authority and to prosecute the work according to the best methods of construction with safety to life and property. The Project consists of the interior renovation work to the Mega Structure and Sewer Maintenance buildings at the Treatment Plant Facility on Bird Island and the Offices located in City Hall for the Buffalo Sewer Authority. Work within the Mega Structure includes the interior upgrades in the existing Control Room with a new kitchen space, supervisory office, and conference space. The work within the Sewer Maintenance building is to include the upgrade of the locker rooms, bathrooms, and a new Dispatch/Breakroom. City Hall’s interior work is to include the addition of an IT room, new storefront entrance and a new entry lobby.
Bids due in 14 days
8/24/22 10:00am
Western Regional Wastewater Treatment Plant
Bids due in 14 days
MRB Group
Wayne County, New York specifically in the Towns of Marion, Macedon, Walworth and the Village of Palmyra.
The project consists of a comprehensive regional initiative to consolidate treatment of four (4) municipal wastewater treatment plants (WWTP) in Wayne County, New York. The four communities involved in the consolidation efforts are the Town of Marion, Town of Macedon, Village of Palmyra and Town of Walworth. The project consists of constructing pump stations at Marion, Macedon and Walworth treatment plants. The work generally includes: demolition of wastewater treatment plant structures, demolition of below grade pipes and utilities, mechanical demolition, decommissioning of WWTP’s, site construction, fencing, drainage, site grading, asphalt paving, concrete/masonry tankage and building construction, equipment installation and process piping, electrical construction, plumbing construction, HVAC construction, Instrumentation and Controls for an overall Supervisory Control and Data Acquisition (SCADA) system for the integration of the remote pump stations with the proposed WWTP system. Forcemains from each of the pump stations will be constructed conveying raw wastewater to the new Regional WWTP in Palmyra, NY. The work generally includes: Construction of forcemains at varying sizes from 8-inch to 24-inch piping, forcemain vault structures, air release vaults and other ancillary forcemain components. Miscellaneous Site improvements including fencing, drainage, site grading and asphalt paving. Contracts #1 and #3 were bid in recent months and only Contract #2 is being rebid. A new Regional WWTP will be constructed directly to the west of the existing Palmyra, NY Wastewater Treatment Plant (associated with Contract #1 and #3 recently bid in June 2022).
Bids due in 6 days
8/16/22 10:00am
Boody's Hill Watermain Extension
Bids due in 6 days
MRB Group
Town of Fayette
Watermain Installation of approx. 500 feet of 8" HDPE water main by Directional Drill methods.
Bids due in 7 days
8/17/22 11:00am
George K Arthur Year 47 Interior Improvements
Bids due in 7 days
Young + Wright Architectural
2056 Genesee Street, Buffalo, NY 14211
Renovation of gang toilet rooms, janitors mop sink, and drinking fountain replacement.
Bids due in 28 days
9/7/22 12:00pm
Former Bethlehem Steel Public Sanitary Sewer & Waterline Extensions
Bids due in 28 days
C&S Engineers, Inc.
Lackawanna, NY
Construction of new water & sewer mains
Bids due tomorrow at 12:00pm
8/11/22 12:00pm
Pavement Reconstruction on Campbell Blvd
Bids due tomorrow at 12:00pm
Town of Amherst Engineering Dept
230 & 180 Campbell Blvd
Pavement Repair on Campbell Blvd