Somerset Wastewater Treatment Plant Improvements
The base bid work consists of providing and installing a sludge drying bed including concrete retaining walls, sand, stone, fabric, sludge distribution lines, drain lines, and all other equipment shown on the plans. The base bid work also includes the removal and disposal of the existing lagoon 2 equipment. Removal, dewatering (20% solids), chemical addition (PAC), and disposal of sludge from existing lagoon. Inspection and repair of clay liner in the lagoon as needed to provide a working system. Providing and installing a new lagoon system including all piping, fittings, valves and equipment startup. The Contractor shall furnish a mobile trash pump for pumping operations. The Contractor is responsible for all permitting and testing requirements for proper disposal of all materials
Plan Holders
Date | Company | Contact |
8/20/25 9:52 am |
American Contracting and Environmental Services, Inc.
11075 Stratfield Ct.
Marriottsville, MD 21104 |
Zack Hein
Tel: 716-796-4067
|
8/19/25 2:21 pm |
Avalon
40 La Riviere Drive
Suite 150 Buffalo, NY 14202 |
Buffalo Service
Tel: 716-995-7777
Fax: 716-995-7778
|
8/19/25 2:21 pm |
Construction Exchange of Buffalo
2660 William Street
Cheektowaga, NY 14227 |
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
|
8/20/25 1:07 pm |
Mark Cerrone, Inc
2368 Maryland Ave.
Niagara Falls, NY 14305 |
Tina Capolupo
Tel: 716-282-5244
|
8/20/25 10:16 am |
STC Construction, Inc.
63 Zoar Valley Road
P.O. Box 459 Springville, NY 14141 |
Jason Rice
Tel: 716-592-3400
|
8/19/25 2:21 pm |
Wendel Companies
375 Essjay Rd
Buffalo, NY 14221 |
Shannon Westoven
Tel: 716-688-0766
Fax: 716-625-6825
|