Somerset Wastewater Treatment Plant Improvements

The base bid work consists of providing and installing a sludge drying bed including concrete retaining walls, sand, stone, fabric, sludge distribution lines, drain lines, and all other equipment shown on the plans. The base bid work also includes the removal and disposal of the existing lagoon 2 equipment. Removal, dewatering (20% solids), chemical addition (PAC), and disposal of sludge from existing lagoon. Inspection and repair of clay liner in the lagoon as needed to provide a working system. Providing and installing a new lagoon system including all piping, fittings, valves and equipment startup. The Contractor shall furnish a mobile trash pump for pumping operations. The Contractor is responsible for all permitting and testing requirements for proper disposal of all materials
Date Company Contact
1755683547
8/20/25 9:52 am
American Contracting and Environmental Services, Inc.
11075 Stratfield Ct.
Marriottsville, MD 21104
Zack Hein
Tel: 716-796-4067
1755627670
8/19/25 2:21 pm
Avalon
40 La Riviere Drive
Suite 150
Buffalo, NY 14202
Buffalo Service
Tel: 716-995-7777
Fax: 716-995-7778
1755627684
8/19/25 2:21 pm
Construction Exchange of Buffalo
2660 William Street
Cheektowaga, NY 14227
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
1755695252
8/20/25 1:07 pm
Mark Cerrone, Inc
2368 Maryland Ave.
Niagara Falls, NY 14305
Tina Capolupo
Tel: 716-282-5244
1755684968
8/20/25 10:16 am
STC Construction, Inc.
63 Zoar Valley Road
P.O. Box 459
Springville, NY 14141
Jason Rice
Tel: 716-592-3400
1755627676
8/19/25 2:21 pm
Wendel Companies
375 Essjay Rd
Buffalo, NY 14221
Shannon Westoven
Tel: 716-688-0766
Fax: 716-625-6825