ECWA Contract GP-011: Water System Improvements-Union Road Corridor Distribution System Improvements

Installation of 1,020± linear feet of 6, 8 and 12-inch Ductile Iron Pipe water main and appurtenances, interconnections to the existing water distribution system, transferring of water services, abandonment of the existing water mains and the associated restoration
Pre-Bid Meeting Minutes (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
ECWA GP-011_02-28-2024 Prebid Meeting Minutes 190.5 KB