Buffalo Sewer Authority- Interiors Renovation Project

The work includes the furnishing of all material, labor, and equipment necessary and proper to complete the construction and renovation of the Sewer Maintenance and Mega Structure buildings at the Bird Island Site and at 1038 City Hall. All work is to include any and all incidental work and materials necessary to fully complete the project as described by the Contract Drawings and Specifications or as directed by the Authority and to prosecute the work according to the best methods of construction with safety to life and property. The Project consists of the interior renovation work to the Mega Structure and Sewer Maintenance buildings at the Treatment Plant Facility on Bird Island and the Offices located in City Hall for the Buffalo Sewer Authority. Work within the Mega Structure includes the interior upgrades in the existing Control Room with a new kitchen space, supervisory office, and conference space. The work within the Sewer Maintenance building is to include the upgrade of the locker rooms, bathrooms, and a new Dispatch/Breakroom. City Hall’s interior work is to include the addition of an IT room, new storefront entrance and a new entry lobby.

Status

Bidding Closed

Prebid Date8/16/22 10:00am

Bid Date9/1/22 11:00am

Company & Contacts

Wendel Companies
Kate Handrich  
716-796-5720- KHandrich@wendelcompanies.com

Location

1038 City Hall Buffalo, NY and Bird Island Waste Water Treatment Plant- 90 foot of West Ferry St., Buffalo NY

Pre-Bid Meeting will be held at the Bird Island Treatment Plant, 90 foot of West Ferry St., Buffalo, NY 14213

This job requires a nonrefundable fee made payable to Avalon.

An electronic download is available made payable to Avalon.