Seneca County Annual Sanitary Sewer Pump Station Maintenance
This contract includes furnishing all labor, equipment, and materials necessary to perform twice weekly preventative maintenance inspections as well as make repairs, as required, for all of the sanitary sewer pump stations within the Routes 318/414 Sewer Conveyance System over a period of 12 months (January 2026 to December 2026)
00 Full Set of Specs
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 66746-1_OUTPUT_Spec | 18.7 MB |
