Town of Hamburg Infrastructure Reconstruction Project, Project: 2025 - 01
8,280 SY of pavement cold milling and rehabilitation (to the grades indicated on the drawings) on Salisbury Avenue from the southern terminus to the south edge of the stop bar at Lake Avenue. The Work shall include adjustment of pavement elevations near existing catch basin grates to promote positive surface flow toward the catch basin and eliminate ponding areas. Otherwise, existing pavement elevations will be matched where positive surface flow is already present
Plan Holders
Date | Company | Contact |
6/26/25 9:41 am |
Avalon
40 La Riviere Drive Suite 150 Buffalo, NY 14202 |
Buffalo Service
Tel: 716-995-7777
Fax: 716-995-7778
|
7/3/25 7:43 am |
Constructconnect
3825 Edwards Road Cincinnati, OH 45209 |
Henri Bradshaw
Tel: 5134585815
|
6/30/25 8:44 am |
Construction Exchange of Buffalo
2660 William Street Cheektowaga, NY 14227 |
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
|
6/26/25 9:42 am | Wendel Companies |
Iain Ramage
|
6/26/25 9:43 am | Wendel Companies |
Ana McCubbin
|