Town of Hamburg Infrastructure Reconstruction Project, Project: 2025 - 01

8,280 SY of pavement cold milling and rehabilitation (to the grades indicated on the drawings) on Salisbury Avenue from the southern terminus to the south edge of the stop bar at Lake Avenue. The Work shall include adjustment of pavement elevations near existing catch basin grates to promote positive surface flow toward the catch basin and eliminate ponding areas. Otherwise, existing pavement elevations will be matched where positive surface flow is already present
Date Company Contact
1750945288
6/26/25 9:41 am
Avalon 40 La Riviere Drive
Suite 150
Buffalo, NY 14202
Buffalo Service
Tel: 716-995-7777
Fax: 716-995-7778
1751528600
7/3/25 7:43 am
Constructconnect 3825 Edwards Road
Cincinnati, OH 45209
Henri Bradshaw
Tel: 5134585815
1751287470
6/30/25 8:44 am
Construction Exchange of Buffalo 2660 William Street
Cheektowaga, NY 14227
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
1750945335
6/26/25 9:42 am
Wendel Companies Iain Ramage
1750945395
6/26/25 9:43 am
Wendel Companies Ana McCubbin