(T) Lockport Lincoln Avenue Extension Sanitary Sewer Replacement
Work consists of the replacement of 820 lineal feet of 15-inch asbestos cement gravity sewer line, manholes, and sewer services along the south side of Lincoln Avenue Extension to the extents shown on the plans. This work shall also include the proper disposal of all asbestos pipe. The work also includes crossing the road via open cut with a casing pipe and carrier pipe with a connection to an existing manhole. The work shall also include bypass pumping and providing temporary sewer service to the residents along the gravity sewer line
Plan Holders
Date | Company | Contact |
6/20/25 9:59 am |
Avalon
40 La Riviere Drive Suite 150 Buffalo, NY 14202 |
Buffalo Service
Tel: 716-995-7777
Fax: 716-995-7778
|
6/20/25 9:59 am |
Construction Exchange of Buffalo
2660 William Street Cheektowaga, NY 14227 |
Joel Brinson
Plan Room Coordinator
Tel: 716-874-3435
Fax: 716-875-4412
|
6/25/25 9:32 am |
Mark Cerrone, Inc
2368 Maryland Ave. Niagara Falls, NY 14305 |
Tina Capolupo
Tel: 716-282-5244
|
6/20/25 11:28 am |
Milherst Construction Inc.
10025 County Road Clarence Center, NY 14032 |
AIMEE POOLE
Tel: 7166889098
|
6/20/25 9:59 am |
Wendel Companies
375 Essjay Road Suite 200 Williamsville, NY 14221 |
Shannon Westoven
Tel: 716.688.0766
|