Gowanda Central School District High School Emergency Pool Repair Project Phase 2
Replace pool mechanical unit and associated ductwork modifications. a. Tile replacement on the interior of the pool including ceramic tile, mud set, waterproof membrane layer, and associated foundation wall repairs. b. Replacement of deep end drain line and associated trenching and backfilling. c. Electrical work associated with mechanical unit replacement.
Addendum 01
(click to expand/collapse)

Name | Size | ||
23045.2_Gowanda Emergency Pool Repair Project_Phase 2_Addenda 01 | 1.9 MB |
Addendum 02
(click to expand/collapse)

Name | Size | ||
23045.2_Gowanda Emergency Pool Repair Project_Phase 2_Addenda 02 | 3.3 MB |