Buffalo School 203 - 156 Kensington High School - PH II Pool Project
Interior pool reconstruction project, including , replacement of pool equipment and piping, pool shell and deck repairs, lighting replacement, locker room upgrades: lockers, toilet, shower partitions, tile flooring, plumbing drainage and waterline work. Multiple Prime Contracts, GC, PC/MC, EC
Addendum 01
(click to expand/collapse)

Name | Size | ||
Addendum 01_BPS 203-156 | 386.8 KB |
Addendum 02
(click to expand/collapse)

Name | Size | ||
0 Addendum 02_BPS 203-156 | 455.2 KB | ||
00 4100 BID FORM_EC_R1 | 714.8 KB | ||
00 4100 BID FORM_GC_R1 | 717.4 KB | ||
00 4100 BID FORM_MC-PC_R1 | 715.3 KB | ||
35_E-100_R1 | 432.0 KB | ||
36_E-101_R1 | 718.2 KB | ||
37_E-200_R1 | 567.5 KB | ||
38_E-201_R1 | 662.6 KB | ||
BPS 203-156_Pre Bid Sign In 02_4-16-25 | 5.3 MB |
Addendum 03
(click to expand/collapse)

Name | Size | ||
00 Addendum 03_BPS 203-156 | 349.9 KB | ||
08 1213 METAL FRAMES | 365.8 KB | ||
08 1433 STILE AND RAIL DOORS | 382.9 KB | ||
14_A-102_203_R1 | 1.2 MB | ||
PRE BID SIGN IN 03_BPS 203-156 | 4.9 MB |
Addendum 04
(click to expand/collapse)

Name | Size | ||
00 Addendum 04_BPS 203-156 | 1.2 MB | ||
01 1000.1 Site Staging & Logistic Plan_R1 | 14.2 MB | ||
02_CC-101_203_R1 | 1.9 MB | ||
03_CC-102_17-2714_156_R1 | 1.2 MB | ||
09_AD-102_203_R1 | 629.9 KB | ||
11_AD-104_203_R1 | 534.3 KB | ||
14_A102_17-2714_156_R2 | 1.2 MB | ||
16_A104_203_R1 | 500.6 KB | ||
19_A601_203_R1 | 1.8 MB | ||
SUBSTITION 02_ LOCKERS MFG | 5.1 MB | ||
SUBSTITUTION 01_MACHFLOW M09 VS XLERATOR XL-SB | 1.4 MB |