VILLAGE OF BLASDELL ADA IMPROVEMENTS AT VILLAGE HALL
The work for Contract 23-1 involves removal of the existing concrete sidewalks, stairs, ramp and railings. The work includes installation of new concrete sidewlaks, stairs, ramp and railings.
Status
Bidding Closed
Bid Date | 9/21/23 1:00pm |
Company & Contacts
Wendel
Sheila Ransbottom
716-688-0766 sransbottom@Wendelcompanies.com
Location
121 Miriam Avenue, Blasdell, New York 14219
Should a bidder find discrepancies in or omissions from the Contract Documents, Drawings or Specifications, or should he/she be in doubt as to their meaning, they should notify the Engineer and request an interpretation thereof. Every request for such interpretation shall be in writing addressed to Sheila Ransbottom (sransbottom@wendelcompanies.com) to be given consideration, and must be received prior to 5:00 pm on Thursday, September 14th, 2023.
A non-refundable fee, made payable to Avalon, is required for this project.