NCWD South Lagoon Removal of Treatment Plant Residuals
The work consists of the removal and disposal of the residual generated by water treatment plant processes from the South Lagoon as well as the north lagoon drainage improvements.
Addendum 01
(click to expand/collapse)

Name | Size | ||
South Lagoon Addendum No. 1 | 2.1 MB |