AK360 RIGHT-OF-WAY WORK GROUP 1014
Right of Way Work
Status
Bidding Closed
Prebid Date11/2/22 11:00am
Bid Date11/9/22 11:00am
Company & Contacts
Wendel Companies
Thomas Reynolds
AK360ROW1014@wendelcompanies.com
Project Location: The Contractor is to perform work at the locations shown on the plans. This includes the work to be performed within the Right-of-Way of Elmwood Avenue from the intersection of Rockwell Road, north to the intersection of Iroquois Drive; within the Right-of-Way of Iroquois Drive from the intersection of Elmwood Avenue, east to the intersection with the Exit ramp from Scajaquada Expressway NY 198 eastbound.
This job requires a nonrefundable deposit check of $58 made payable to the City of Buffalo DPW.
Hard Copy Only No Electronic Download Available