Erie County Water Authority CH-013 Water System Improvements
750 linear feet of 8-inch ductile iron pipe and appurtenances, including a steel casing installed via jack-and-bore methods, on the north side of NYS Route 33 at the interchange with I-90, Town of Cheektowaga
Status
Accepting Bids
Prebid Date | 6/10/25 9:00am |
Bid Date | 6/24/25 10:00am |
Company & Contacts
CHA Consulting Inc.
Muffett Mauche George
(716)-491-7400
Location
NW Rte 33 Ramps from/to NYSTA Route 90, Town of Cheektowaga
This project requires a non-refundable fee of $120 made payable to Avalon.
This project is hard copy only, electronic download option not available.