Erie County Water Authority CH-013 Water System Improvements

750 linear feet of 8-inch ductile iron pipe and appurtenances, including a steel casing installed via jack-and-bore methods, on the north side of NYS Route 33 at the interchange with I-90, Town of Cheektowaga

Status

Accepting Bids

Prebid Date 6/10/25 9:00am
Bid Date 6/24/25 10:00am

Company & Contacts

CHA Consulting Inc.
Muffett Mauche George  
(716)-491-7400

Location

NW Rte 33 Ramps from/to NYSTA Route 90, Town of Cheektowaga

This project requires a non-refundable fee of $120 made payable to Avalon.

This project is hard copy only, electronic download option not available.