NCWD Water Treatment Plant Admin Roof Replacement

Work consists of removing the existing ballast roof system in its entirety as shown and specified, replacing with TPO roofing system with tapered insulation and cover board.
Specs (click to expand/collapse)
Name Size
17729-1_OUTPUT_Spec 24.4 MB