Buffalo Sewer Authority, Raw Wastewater Pump #3 Rehabilitation Project
Removal and shop rebuild of raw wastewater vertical centrifugal pump #3, magnetic variable speed drive, and 600HP motor. Including a new 60" discharge valve and PLC based control system for pump #3.
Status
Bidding Closed
Prebid Date5/19/22 10:00am
Bid Date6/3/22 10:00am
Company & Contacts
GHD
David Woolley
David.woolley@ghd.com
Location
Bird Island Wastewater Treatment Plant, 90 West Ferry Street, Buffalo, NY 14213
A non-mandatory pre-bid meeting will be held at the Bird Island WWTP (address above) in the Treatment Plant Administration Building followed by a site walk-through.
This job requires a nonrefundable fee made payable to Avalon.
Hard Copy Only NO Electronic Download Available