Renovate Classroom Building - Demolition/Abatement/Envelope

This project involves the removal of all hazardous materials, demolition and building envelope renovations of the Classroom Building. The existing four-story building is approximately 106,410 gsf. The work includes, but is not limited to, sequencing of work, temporary partitions, fa├žade mockup, demolition and removals, asbestos abatement, cutting and patching, concrete, structural steel, cold-formed metal framing, exterior sheathing, metal stairs, rough carpentry, metal wall panels, metal composite panels, terra cotta, limestone, rainscreen systems, roofing, thermal protection, sealants, expansion joints, doors & hardware, windows, curtain walls, louvers, metal barrier screen & gate, fire suppression, plumbing, temporary HVAC, electrical, earthwork & site remediation.

Status

Accepting Bids

Prebid Date11/17/21 2:00pm

Bid Date12/14/21 2:00pm

Company & Contacts

Architectural Resources PC

Hillary Georgi hgeorgi@archres.com   716.883.5566

Location

SUNY Buffalo State 1300 Elmwood Avenue, Buffalo, NY 14222, Classroom Building

This job requires a nonrefundable fee made payable to Avalon.

An electronic download is available made payable to Avalon.

Pre-Bid Walk Through: November 17, 2021, 2 p.m., room 122 Classroom Building.

All attendees at Pre-Bid walk through will be required to wear a face mask at all times while on campus.