Classroom Building Surge

This project involves interior renovation of select spaces within Buckham Hall and Cassety Hall to provide for temporary office, laboratory and classroom spaces. Renovation will include work to subdivide existing rooms into private faculty offices, convert existing rooms into laboratory spaces, convert an existing commercial kitchen and associated serving line areas into faculty and student laboratory spaces, and renovate existing faculty offices. Work will involve removal of existing flooring, walls, ceilings, casework, plumbing fixtures and systems, and electrical and data systems. Work will include construction or installation of flooring, metal stud partitions, ceilings, casework, countertops, doors, window treatments, sinks and associated plumbing systems, electrical and data upgrades, installation of air-conditioning to select spaces and modifications to existing ventilation systems.

Status

Bidding Closed

Prebid Date12/17/20 2:30 pm

Bid Date1/6/21 2:00 pm

Company & Contacts

Architectural Resources

James Maurer, jmaurer@archres.com   7168835566

Location

UNY Buffalo State 1300 Elmwood Avenue, Buffalo, NY 14222, Buckham Hall and Cassety Hall

All attendees at Pre-Bid walk through will be required to wear a face mask at all times while on campus.

This job requires a non-reundable deposit of $49.00 made payable to Avalon.

A download or CD of the job is available for $10.00 made payable to Avalon.

Full Purchase Only