17046.1- Lancaster CSD Renovations 2018 - Phase 1

1. Como Park Elementary – Replacement of existing windows, including masonry repairs, sealant replacement, and coating of exterior E.I.F.S. surfaces. 2. High School – Replacement of existing tennis courts and site lighting. Remediation of lead from basement areas and providing new concrete slabs in the basement. 3. Hillview Elementary – Replacement of doors, hardware, flooring and millwork. Removals involve abatement of asbestos. 4. John Sciole Elementary – Replacement of parking lots and sidewalks. Masonry and concrete repairs to the existing building envelope at the loading dock. 5. Middle School – Plaster repairs, historic renovations, and improvements to the Auditorium; Library renovations; door, ceiling, and lighting replacement. Plumbing system improvements. 6. William Street School – Replacement of parking lots, sidewalks, site lighting, and site drainage. Replacement of existing building shingle roofs with metal roofs and replacement of skylights.

Status

Pending

Company & Contacts

Young and Wright Architectural

Eric Zeffiro, YWA Project Architect   1-716-842-1800

Location

Lancaster High School, Lancaster Middle School, Como Park Elementary, Hillview Elementary, John Sciole Elementary, William Street Elementary

Refer to specification section “001116 – Invitation To Bid” for pre-bid and bid dates and times per contract.
Pre-Bid
January 14th, 2020; 2:00 PM (Contracts 102 and 108).
January 16th, 2020: 2:00 PM (Contracts 103, 107, 109, 122, 123, 126, 131, 132).

Bid Date:
February 4th, 2020; 3:00 PM (Contracts 102 and 108). February 11th, 2020: 3:00 PM (Contracts 103, 107, 109, 122, 123, 126, 131, 132)

Refundable in the amount of $100.00 made payable by check only to Lancaster Central School District
Digital download $25.00

Refundable – WITH RETURN OF DRAWINGS AND SPECS